banner

Products

Special Spua for Municipal Engineering

Special Spua for Municipal Engineering

Roofing polyurethane material to prevent root puncture TH-8029/Spray Polyurea Elastomer Coating SPUA for Anticorrosion a
SHARE

Description

Basic Info.
Model NO. TH-901
Ceiling Tile Type Metal Ceilings
Surface Treatment Spray Painted
Function Anti-static, Fireproof, Heat Insulation, Sound-Absorbing, Waterproof
Certification ISO, MSDS, ISO14001, ISO9001
Color Component a: Transparent/Light Yellow B Customized
Usage Outdoor, Indoor
Formula R-Nh-Co-CH-R`
Einecs Polyurea
Formation Mechanism Conversion Type
Substrate No Limit
Drying Method Chemical Merchanism Drying
CAS No. Polyurea
Method Spray
Components Film Forming Matter
Level Finish Coat
Main Raw Material Polyurethane
Appearance Liquid
Transport Package Pallet
Specification Component A: 220KG/bucket Component B: 210KG/bucke
Trademark 0
Origin China
HS Code 3911900003
Production Capacity 8000t/Year
Product Description
Roofing polyurethane material to prevent root puncture TH-8029/Spray Polyurea Elastomer Coating SPUA for Anticorrosion and waterproof protection of construction, chemicals, transportation,metallurgy,electric power, aerospace, marine, shipbuilding and other fields.

Special Spua for Municipal Engineering


Company Information
Roofing polyurethane material to prevent root puncture TH-8029 /Two components polyurea material for planting roof to prevent root puncture TH-8029
ItemTechnical Index
GB/T 23446-2009 Type TWOTH-8029
Solid content (%)≥9899
Gel time (S)≤4515
Surface drying time (S)≤12060
Tensile strength (Mpa)≥1617
Elongation at break≥450455
Tear strength (N/mm) ≥5058
Low temperature bending property (ºC) ≤-40≤-40
Water-impermeable (0.4Mpa, 2H) Water-impermeableWater-impermeable
Heating expansion rate (%)Elongation≤1.00.4
Shrink≤1.00.4
Bond strength (MPa)≥2.5
Water absorption rate (%)≤5.02
Aging at constant extensionHeating aging No cracks and deformation
Artificial climate aging No cracks and deformation No cracks and deformation
Heat treatmentElongation at break (%) ≥400430
Alkali treatment Elongation at break (%) ≥400425
Acid treatmentElongation at break (%) ≥400420
Salt treatment Elongation at break (%) ≥400450
Artificial weatheringTensile strength retention rate (%)80~15099
Elongation at break (%)≥400445
Low temperature bending property (ºC)≤-35-38
Hardness (Shore A)≥8090±5
Wear resistance (750g/500r)/mg≤304.2
Impact resistance (kg/m)≥1.01.5
ColorCustomized


Construction and Project case
The versatility of spray polyurea products
Product shelf life and storage:1. The storage temperature should be 5-40ºC2. Under normal storage and transportation conditions, the storage period is not less than 6 months from the date of production3. Store in a cool, ventilated environment, avoid direct sunlight, prohibit close to fire sources, and prevent collisions4. Packaging: component A: 220KG/drum, component B: 210KG/drum
Precautions:1. During construction, the temperature of the substrate must be 3°C higher than the dew point temperature;2. Before the product is used, component B should be fully stirred;3. The system has a 100% solid content, and it is strictly forbidden to add any diluent;4. During construction in a confined space, good ventilation must be maintained;5. When using this product, you must wear work clothes, goggles, gas masks, gloves and other protective equipment.
Product application guidance:Recommended spraying machine: Graco H-XP3 polyurea spraying equipment spray gun; air or mechanical self-cleaning polyurea spray gunStatic pressure 2300-2500psi; dynamic pressure 2000-2200psiRecommended dry film thickness: 1000-3000μmRecoating interval≤6h
Proportion: Component A: Component B =1:1

Packaging and Shipping
FAQ
1. What is the price for polyurea materials?
The price is decided by Quantity .

2. How about samples?
Sample Lead Time: 5 working daysSample Fee:1).It's free for all for a regular customer
2).For new customers, we will charge first, it is fully refundable when order confirmed.

3. How many days for shipping?
Shipping Methods and Lead Time:
By Express: 3-5 working days to your door (DHL, UPS, TNT, FedEx...)
By Air: 5-8 working days to your airport
By Sea: Pls advise your port of destination, the exact days will be confirmed by our forwarders, and the following lead time is for your reference. Europe and America (25 - 35 days), Asia (3-7 days), Australia ( 16-23 days)
4. What is the Terms of Payment?
Credit Card,T/T, L/C, Western Union; 30% T/T in advance, 70% before delivery.5. Packaging & Shipping ?Pallet, wooden case or with outer carton, or as customers' specific requirements.
6. Why choose your company?
We are focusing on all aspects of anticorrosive waterproof, insulation fields. US technology and made in China, high quality and nice prices.
We strictly implement the rules according to the quality standard in every aspects from the purchase of raw material to the production process and outgoing of products.
Great service and Superior quality is provided all the time…
Packaging & Shipping Packing: Carton, wooden box and pallet, or as customers' requirements.
Shipping: By Express (DHL /UPS /TNT /FedEx /EMS), By Air, By Sea

Our Contact